Massive sulphide intersected by NDD0004, which returned an average grade of 1.35% Ni. Source: Aldoro
The Market Online - At The Bell

Join our daily newsletter At The Bell to receive exclusive market insights

  • Aldoro Resources (ARN) has released multiple assays for its Western Australia based nickel-copper-platinum group element project Narndee Igneous Complex
  • ARN completed new intersections at the end of last year, with six diamond drills and eight reverse circulation (RC) holes at the VC1 and VC3 targets
  • Results include 55.6 metres at 0.19 per cent nickel and 0.06 per cent copper from 246m, including 0.38m at 1.11 per cent nickel and 0.04 per cent copper from 301.22m at VC1
  • The NDD0005 hole at VC3 was extended as it re-entered a high magnesium oxide ultramafic package with scattered dissemination of magmatic sulphides after it passed through the target
  • Aldoro shares are trading down 3.61 per cent at 40 cents a share

Aldoro Resources (ARN) has released multiple assays for its Western Australia based nickel-copper-platinum group element project Narndee Igneous Complex.

ARN completed new intersections at the end of last year, with six diamond drills and eight reverse circulation (RC) holes at the VC1 and VC3 targets.

According to the announcement, the company has received assays for five holes at VC1 and one at VC3, while additional results remain pending.

Best results for the VC1 target drilling include 55.6 metres at 0.19 per cent nickel, 0.06 per cent copper and 0.01 per cent cobalt from 246 metres, including 0.38 metres at 1.11 per cent nickel, 0.04 per cent copper and 0.07 per cent cobalt from 301.22 metres.

Also, 80.9 metres at 0.26 per cent nickel, 0.07 per cent copper and 0.02 per cent cobalt from 192 metres, including 1 metre at 1.35 per cent nickel, 0.36 per cent copper and 0.09 per cent cobalt from 271.9 metres.

The ND0005 hole at VC3 was extended as it re-entered a high magnesium oxide ultramafic package with scattered dissemination of magmatic sulphides after it passed through the target.

ARN said lab results for this intersection found 31.3 per cent magnesium oxide and 0.22 per cent nickel, demonstrating the high prospective of the region, more so, at a depth.

Following the Priority 1 VTEM survey in early January, any conductors generated will be groundtruthed, mapped, and sampled by surface geochemistry.

Aldoro shares were trading down 3.61 per cent at 40 cents a share at 11.39 am AEDT.

ARN by the numbers
More From The Market Online
The Market Online Video

Market Close: ASX has a red sector day on reports of Israeli strikes on Iran

The ASX200 has seen red, closing down 0.98% as reports of Israel launching retaliatory attacks on Iran ripped through global markets on …

Week 15 Wrap: USA uncertain, ECB shrugs at the Fed & gold, gold, gold

Depending on what interests you more, there were two big stories this week for the international…

Week 16 wrap: VIX jumps; IMF eyes US debt; Oz CPI & Mag7 reports next week

Uncertainty reigns, and not just because Israel has reportedly attacked Iran. The VIX hitting a six…

Strike pins hopes on seismic show to brighten Perth Basin prospects

Strike Energy has started two rounds of seismic exploration in the Perth Basin, with the first…