Azure Minerals (ASX:AZS) - Managing Director, Anthony Rovira
Managing Director, Anthony Rovira
Source: Azure Minerals
Market Herald logo

Subscribe

Be the first with the news that moves the market
  • Azure Minerals (AZS) finds a new zone of nickel and copper sulphide mineralisation at the Skyline prospect, located with the Andover Project in the Pilbara region of WA
  • So far, the company has drilled 133 holes at Andover, with three holes at Skyline
  • All three holes intersected intervals of nickel and copper sulphide mineralisation at the modelled depths
  • Additionally, over at the VC-07 prospect further intersection of massive nickel and copper sulphides were found
  • As the market opens this morning, Azure is up 19.1 per cent to 40.5 cents at 10:35 am AEDT

Ongoing drilling at Azure Minerals’ (AZS) Skyline prospect has discovered a new zone of nickel and copper sulphide mineralisation.

Skyline is about 300 metres to the west of the VC-23 prospect, which is part of the Andover Project, located in the Pilbara region of Western Australia.

To date, 133 diamond drill holes have been completed at Andover for a total of 58,808 metres, with three holes at Skyline.

All three holes intersected intervals of nickel and copper sulphide mineralisation at the modelled depths.

Results include 7.4 metres of disseminated nickel-copper sulphides from 55.5 metres and 2.9 metres of disseminated nickel-copper sulphides from 70 metres.

Additionally, over at the VC-07 prospect, further intersections of massive nickel and copper sulphides were found.

With results including two metres massive to disseminate nickel-copper sulphides from 245.8 metres and 0.9 metres of massive to matrix nickel-copper sulphides from 356.6 metres.

Managing Director Tony Rovira is very pleased that regional exploration drilling has “got off to a great start”.

“The first three holes all intersected Ni-Cu sulphide mineralisation coinciding with EM conductors, confirming that on the Andover Project, electrical conductance continues to be associated with sulphide mineralisation,” he said.

“Meanwhile our drilling continues to intersect substantial Ni-Cu sulphide mineralisation within the VC-07 mineralised corridor, with the latest massive sulphide intersections at VC-07 West also coinciding with electromagnetic conductors.”

As the market opens this morning, Azure is up 19.1 per cent to 40.5 cents at 10:35 am AEDT.

AZS by the numbers
More From The Market Herald
Limeade (ASX:LME) - CEO, Henry Albrecht

" Limeade (ASX:LME) maintains FY21 financial guidance in quarterly report

Limeade (ASX:LME) has maintained its FY21 revenue guidance of $50 million to $53 million, but posted…
Sihayo Gold (ASX:SIH) - Executive Chairman, Colin Moorhead

" Sihayo Gold (ASX:SIH) secures further interim funding

Sihayo Gold (ASX:SIH) has secured interim funding from its shareholder, PT Saratoga Investama Sedaya Tbk.

" Alchemy Resources (ASX:ALY) commences aircore drilling at Karonie

Aircore drilling is underway at Alchemy Resources' (ASX:ALY) Karonie gold project 110 kilometres east of Kalgoorlie,…
Little Green Pharma (ASX:LGP) - Managing Director, Fleta Solomon

" Little Green Pharma (ASX:LGP) seeks to expand to Greece

Little Green Pharma (ASX:LGP) seeks to expand to Greece