Source: Boab Metals
The Market Online - At The Bell

Join our daily newsletter At The Bell to receive exclusive market insights

  • Boab Metals (BML) has begun a phase five diamond drilling program at the Sorby Hills Project in WA’s Kimberley region
  • The 48-hole drilling program will target multiple areas, but this may be extended depending on whether significant intercepts arise
  • Boab aims to extend the lead-silver-zinc project’s mine life and increase the production capacity proposed in the Sorby Hills Definitive Feasibility Study
  • In addition, Boab will conduct initial drilling at the Eight Mile Creek Project which lies immediately south of Sorby Hills
  • Drilling is expected to be completed in early July, with assays to follow soon after
  • Company shares are up 1.32 per cent and are trading at 38.5 cents

Boab Metals (BML) has begun a phase five drilling program at the Sorby Hills Project in WA’s Kimberley region.

This round of diamond drilling will test targets identified in the fourth phase, infill and extend the zinc-rich Alpha and Beta silver deposits, and test lead mineralisation at the Wildcat target.

The fourth phase was completed earlier this year and included 58 holes. Results peaked at 4.69 per cent lead and 39g/t silver and led to a 56-per-cent increase in measured resources.

Overall, Boab aims to extend the lead-silver-zinc project’s mine life and increase the production capacity proposed in the Sorby Hills Definitive Feasibility Study.

Boab will drill at least 48 holes, for 4200 metres, but this may be extended to follow up on any significant intercepts that may arise.

The company will also conduct initial drilling at the Eight Mile Creek Project which lies immediately south of Sorby Hills.

“With our metallurgical and geotechnical drilling complete, a current mine plan underpinned 92 per cent by reserves and nearly $14 million in cash on hand, we are in a great position to aggressively focus drilling metres toward adding tonnes and grade to our Sorby Hills mining inventory and testing the blue-sky prospectivity of our Eight Mile Creek Project,” Managing Director and CEO Simon Noon said.

Phase five drilling is expected to be completed in early July with assays to follow.

Company shares are up 1.32 per cent and are trading at 38.5 cents at 10:53 am AEST.

BML by the numbers
More From The Market Online

Patagonia pumps up with pride on maiden test well delivery at Formentera

Patagonia Lithium has reached a milestone in testing for its Formentera project in northwest Argentina, completing…

High grade sniffs in Africa push Mako shares up 14%

Mako Gold Ltd (ASX: MKG) has seen its shares jump above 14 percent on news that it has discovered a high grade zone

Fortescue recovers from iron ore export slump with record shipments in month of March

Fortescue has delivered a mixed-bag report for the March 2024 Quarter, showing a recovery in iron…
Magnetite

Fe grades above 71% make Cyclone Metals bullish about Iron Bear pilot plant

Cyclone Metals, an iron ore developer which has built its business progressing Canadian magnetite play Iron…