The Market Online - At The Bell

Join our daily newsletter At The Bell to receive exclusive market insights

  • Challenger Exploration (CEL) releases a maiden mineral resource estimate (MRE) of 2.1 million ounces for its flagship Hualilan gold project in San Juan, Argentina
  • The MRE comprises two mineralisation styles: higher-grade limestone skarn mineralisation and lower-grade intrusive and sediment-hosted mineralisation
  • The skarn component comprises 6.3 million tonnes at 5.6 g/t gold equivalent, while the sediment-hosted component comprises 41.4 million tonnes at 0.8 g/t gold equivalent
  • The MRE was based on 125,700 metres of Challenger’s 204,000-metre drilling program and has been regarded as an interim resource to be updated when drilling wraps up
  • Challenger is down 1.92 per cent on the market with shares trading at 26 cents at 1:42 pm AEST

Challenger Exploration (CEL) has released a maiden 2.1-million-ounce mineral resource estimate (MRE) for its flagship Hualilan gold project in San Juan, Argentina.

The MRE comprises two mineralisation styles: higher-grade limestone skarn mineralisation and lower-grade intrusive and sediment-hosted mineralisation.

The skarn component comprises 6.3 million tonnes at 5.6 grams of gold per tonne (g/t gold) equivalent for 1.1 million ounces of gold equivalent, while the sediment-hosted component comprises 41.4 million tonnes at 0.8 g/t gold equivalent for one million ounces of gold equivalent.

The MRE was based on 125,700 metres of Challenger’s planned 204,000-metre drilling program and, as such, has been regarded as an interim resource estimate to be updated when drilling wraps up.

The company said mineralisation remained open in all directions and there was a strong potential for the MRE to significantly grow with extension and infill drilling.

“As much as I am delighted by this maiden resource, it is an interim resource estimate. It includes only 126,000 metres of our 204,000-metre drill program, covering 2.2 of the 3.5 kilometres of strike, over which the high-grade mineralisation has been intersected,” Managing Director Kris Knauer said.

“With mineralisation open in all directions, this interim resource estimate provides a window to the substantial potential at Hualilan.

“Importantly, we have found significantly more high-grade skarn mineralisation than expected, with it comprising more than half of this interim MRE.”

Once the remainder of the 204,000-metre drilling program has been completed, Challenger will begin a scoping study for the project.

Challenger was down 1.92 per cent on the market with shares trading at 26 cents at 1:42 pm AEST.

CEL by the numbers
More From The Market Online

Week 13 Wrap: Easter bunny delivers new all time high for ASX200

Another week, another all time high. The ASX200 clocked 7,901pts on Thursday for the first time…
The Market Online Video

Market Close: Green lights up on ASX for Easter hunt go

The ASX200 closed the day in record territory - nearly a per cent up with every…

Market shrugs as Fisher & Paykel announces mass recall

Fisher & Paykel has initiated a voluntary limited recall of batches of Airvo 1 and my…
The Market Online Video

Market Update: ASX glows red hot with another hit record

The ASX200 is trading up, hitting a new high of 7901 point and eclipsing the last…