Venturex Resources (ASX:VXR) - Non Executive Chairman, Anthony Kiernan
Non Executive Chairman, Anthony Kiernan
Source: Business News
The Market Online - At The Bell

Join our daily newsletter At The Bell to receive exclusive market insights

  • After experiencing some delays, Venturex Resources (VXR) is about to begin drilling at the Sulphur Springs Copper-Zinc Project in Western Australia
  • Sulphur Springs has a total mineral resource of 17.4 million tonnes at 1.3 per cent copper, 4.2 per cent zinc and 17g/t silver
  • Drilling will start at the XA8 prospect with two holes planned to test an electromagnetic target and associated mineralisation
  • Venturex will then move to the Breakers Prospect where four holes will follow-up a high-grade zinc intersection
  • Additionally, two further holes will be completed to follow up zinc mineralisation from Breakers North
  • Venturex is trading 9.52 per cent higher at 11.5 cents just before market close

After experiencing some delays, Venturex Resources (VXR) will soon commence drilling at the Sulphur Springs Copper-Zinc Project.

Sulphur Springs is located southeast of Port Hedland, Western Australia, and hosts a total mineral resource of 17.4 million tonnes at 1.3 per cent copper, 4.2 per cent zinc and 17g/t silver.

The project includes the proposed Sulphur Springs and Kangaroo Caves mines along with tenements that cover 27 kilometres of the Panorama trend. This trend is known to host multiple advanced volcanogenic massive sulphide-style exploration targets.

Drilling has been designed to follow-up on exceptional results generated from drilling last year at the Breakers Prospect. Drilling will also test the heli-borne electromagnetic (HEM) target where previous drilling intersected anomalous nickel-chromium mineralisation.

The program will begin at the XA8 prospect with two holes planned to test the continuation of a downhole electromagnetic (DHEM) target and associated mineralisation.

After this, Venturex will move to the Breakers prospect where four holes will follow-up the along-strike and down-plunge continuation of massive sulphide mineralisation which returned a high-grade intersection of 18 metres at 7.75 per cent zinc.

Additionally, two further holes will be completed to follow up the mineralisation intersection in one hole at the Breakers North target last year which returned eight metres at 3.37 per cent zinc.

Venturex is trading 9.52 per cent higher at 11.5 cents just before market close on October 20.

VXR by the numbers
More From The Market Online

Battery Age aims to build geological knowledge at Ontario lithium play

Battery Age Minerals hopes to build on the exploration at Canadian lithium play, Falcon Lake -…
Pig Iron Production

Magnum pushes Saudi pig iron project further down the road to Nevada

Magnum Mining & Exploration has solidified plans to produce green pig iron in Saudi Arabia from…

OD6 Metals posts TREO grade boost of 224% in met tests

OD6 Metals has posted an increase in total rare earth oxide (TREO) grades at Splinter Rock…

Exploration bumps up resource at Eloise mine and satellite projects for AIC

AIC Mines Ltd has bumped up mineral resources and reserves at its projects in North Queensland,…