A dozer preparing access tracks and drill pads at the Chubb project in Canada. Source: Burley Minerals
The Market Herald - At The Bell

Join our daily newsletter At The Bell to receive exclusive market insights

  • Burley Minerals (BUR) intercepts high-grade results from its first round of assays at its Chubb lithium project in Quebec, Canada
  • Assays from the first three holes of the maiden drilling program include 8.2 metres at 1.31 per cent lithium oxide from 130.4 metres, and 7.7 metres at 1.30 per cent lithium oxide from 80.1 metres
  • Burley commenced drilling in April, with 14 diamond core holes completed to date
  • Meanwhile, the company is planning to finalise the acquisition of the Bouvier lithium project, located 14 kilometres northwest of the Chubb project
  • Shares were down 14 per cent to 21.5 cents at 4:00 pm AEST

Burley Minerals (BUR) has intercepted high-grade results from its first round of drilling at its Chubb lithium project in Quebec, Canada.

Results from the first three holes of the maiden drill program included 8.2 metres at 1.31 per cent lithium oxide from 130.4 metres, including 4.2 metres at 1.93 per cent lithium oxide, and 7.7 metres at 1.3 per cent lithium oxide from 80.1 metres.

The assays also confirmed visual observation of spodumene, a prime lithium mineral, in the pegmatites.

“The receipt of such highly encouraging results in such a short period of time is a major milestone for Burley Minerals following the recent acquisition of the Chubb lithium project in February this year,” Burley Minerals Chairman Bryan Dixon said.

“The new drilling intersections build on a high-grade spodumene zone identified in mapping and subsequently in drilling undertaken in 2021 and 2022, and the company is eagerly anticipating the remaining assay results from the current program during June.”

Burley commenced drilling in April, completing 14 diamond core holes to date, with the program set to resume later in June.

Meanwhile, the company is planning to push ahead with the acquisition of the Bouvier lithium project, located 14 kilometres northwest of the Chubb project.

Burley was down 14 per cent, trading at 21.5 cents at 4:00 pm AEST.

BUR by the numbers
More From The Market Herald
The Market Herald Video

TMH Market Update: ASX200 down 0.3pc as energy sector falters

The ASX200 is down just over a third of a per cent. Most sectors are in…

Invictus Energy announces gas discovery in Mukuyu-2 well, Zimbabwe

Invictus Energy (ASX:IVZ) has been trading higher today after announcing a gas discovery in the Mukuyu-2…

BBX Minerals extends Ema REE mineralisation to 7km x 6km

BBX Minerals (ASX:BBX) has extended the REE mineralisation at Ema in the Apuí region of Brazil…

Cynata Therapeutics receives approval to launch phase two trial of CYP-001 in Turkey

Cell therapy company, Cynata Therapeutics (ASX:CYP) has received regulatory and ethics approval to commence a phase…