Serowe crew drilling Serowe-3 CBM well on location. Source: Pure Hydrogen
The Market Online - At The Bell

Join our daily newsletter At The Bell to receive exclusive market insights

  • Pure Hydrogen (PH2) and joint venture partner Botala Energy spud the Serowe 4 well at the Botswana Coalbed Methane Serowe Gas project
  • The well is the first of a two-well program which has been designed to expand on previous results from the Serowe 3 well
  • Drilling of Serowe 4 as well as Serowe 5, which are both five-kilometre step out wells from Serowe 3, are scheduled to be drilled by the end of this year
  • Moving forward, the results will be used to determine the location of a commercial pilot program scheduled for the first half of 2022
  • Shares have been trading 2.68 per cent lower at 72.5 cents

Pure Hydrogen (PH2) and joint venture partner Botala Energy have spudded the Serowe 4 well at the Botswana Coalbed Methane Serowe Gas project. 

The well is the first of a two-well program which has been designed to expand on previous results Botala delivered from the Serowe 3 well. 

Botala Energy advised Pure Hydrogen of the spudding. PH2 is free carried on the first $6 million expenditure in the project.

Serowe 3 was drilled to a total depth of 477 metres and encountered 41 metres of interpreted gassy coal seams more than 200 per cent thicker than pre-drilling estimates, with free gas breaking out of fluids on surface.

PH2 said processing of logs from the well using a new method showed absorbed and free gas indicating permeability in several of the target coal seams. 

Drilling of Serowe 4 as well as Serowe 5, which are both five-kilometre step out wells from Serowe 3, are scheduled to be drilled by the end of this year. 

Both wells are targeting a similar thickness to Serowe 3, while improving the company’s understanding of the regional geology of the upper and lower Morupule seams within the acreage. 

Moving forward, the results from the two wells will be used to determine the location of a commercial pilot program scheduled for the first half of 2022. 

Additionally, the company plans to extend flow-testing of the Serowe 3 well to test water flow-rates in the pilot program surface facilities design. 

Shares were trading 2.68 per cent lower at 72.5 cents at 2:28 pm AEDT.

PH2 by the numbers
More From The Market Online

Hartshead picks up 10 blocks offshore UK in latest North Sea auction

Energy microcap with a portfolio of offshore UK assets, Hartshead Resources (ASX:HHR), has announced the results…

Boss Energy hurtling towards domestic uranium sales in 1H FY25

Australian uranium producer Boss Energy (ASX:BOE) has announced it's preparing for first uranium sales as early…

Tamboran is listing on the NYSE, and Wall Street is paying attention

If you needed evidence that Tamboran Resources is bullish on the NT's Beetaloo Basin, look no…
The Market Online Video

Lithium Universe successfully locks in $3.65M to advance North American play

Lithium Universe (ASX:LU7) has announced its receipt of a confirmed $3.64M to advance its North American…